Case study
The top team, then the ones around it
KalsecTeam effectiveness
1 min read
5 teams
Which is the part that makes team work affordable past the first room. One instrument, one session shape, and no redesign between them.
One founding session, then four more on the same design
The situation
A European leadership team of eight needed alignment on priorities, and the silos that had built up inside Europe and across the wider company needed breaking down. The team was accomplished and the problem was not capability, it was how they worked with each other.
What we did
Ran a driver assessment across all eight leaders before the session, and read the results three ways: each person alone, each pair, and the team as a whole.
Opened the morning on personal insight, moved to paired conversations, then had the group name where it works and where it sticks. Two openings surfaced: conflict, and how work moves between people. The team wrote its commitments before lunch.

The afternoon went on the team's own contentious issues, worked live, watched against the commitments written that morning. Afterwards, a summary of where the team had headway and where it did not, plus a separate report to the leader on how to hold the new norms.
What changed
The team left with commitments it had tested the same day rather than agreed to in principle. The design then ran for Sales, R&D, HR and Asia. One instrument, one structure, no rebuild between rooms.
Since then
Five teams have run the same design. Running a sixth takes a facilitator and a survey.
- teams
- facilitation
- cross-functional
Disagree with this?
Good. The argument is more useful when someone pushes on it. Tell us where it breaks down, or bring us the version of this problem you are actually facing.